Supply Chain Kanban Setup Worksheet

Interactive worksheet to design and pilot a simple Kanban system for consumable medical supplies. Capture pilot items, map usage and reorder points, define Kanban card contents and placement, calculate reorder quantities, assign roles and daily checks, and record baseline metrics to track improvements.

Interactive Tool

Supply Chain Kanban Setup Worksheet

Use this worksheet to design, pilot, and document a simple Kanban system for consumable medical supplies. The form guides you through selecting pilot items, mapping usage and reorder points, defining Kanban card contents and placement, calculating suggested reorder quantities, assigning roles and daily checks, and capturing metrics you can track over time. Adapt fields to your local policies and device specifications.

Where will the pilot run? e.g., Endoscopy suite, Sterile Processing, Cath Lab.
Person responsible for running the pilot and updating this worksheet.
List item code and short description for each pilot SKU. Pick a small set (3–8) with high use variability or frequent stockouts.
Describe where each pilot item is used/stored, who reorders it today, and any current reorder triggers or par levels.
Choose the information each Kanban card should show. You can add local fields later.
Where will the Kanban card and replenishment bin live? Choose the option that best fits each pilot item.
Only fill if you selected Other above.
Average units used per day for the pilot item. Use historical pull or par consumption data where available.
Typical time from reorder to delivery. For internal replenishment (central supply → unit) enter internal lead time.
Number of days of additional cover to reduce stockout risk. Start small (1–3 days) for a pilot and adjust based on variability.
Minimum orderable quantity or pack size. We recommend using this when converting calculated quantity to whole packs.
Suggested formula: avg daily usage * (lead time days + safety stock days). Convert to whole packs by rounding up to nearest multiple of pack size. Enter the final chosen quantity here.
Who performs the daily visual check, who pulls the Kanban, who places the replenishment order, and escalation steps for shortages.
Select metrics you will record to evaluate pilot success.
Enter your current average stockout events per month for the pilot item (if known).
Enter the current average expired items found per month (if known).
Optional monetary estimate of carrying cost attributable to this pilot item.
Describe any steps required to link Kanban to SP processes: labeling, traceability, turnaround time expectations, or special handling.
Quick action items, dates for review, training required, or vendor coordination notes.
YYYY-MM-DD format recommended.
Quick team assessment of how ready you are to run the pilot.
1.0 10.0
Saving this worksheet will record the pilot design and baseline values for future comparison.
You can explore this tool now. Sign in or create an account to save your responses and return to them later.
Make this tool part of your work

Save a personal copy, bring it to your team, or tailor the questions and workflow to fit what you are hungry to improve.

Member customization and team collaboration are coming soon.

Discussion

Comments and conversation will live here.