Operational Baseline Assessment Template (Quick Diagnostic)

A guided, fillable 90-minute workshop assessment that scores Safety, Quality, Delivery, Cost, and Reliability, collects evidence, captures top gaps, assigns pilots and owners, and produces prioritized quick wins and a 30/60/90 plan.

Interactive Tool

Operational Baseline Assessment (Quick Diagnostic)

Purpose

This short assessment helps teams establish a clear operational starting point by scoring core capability areas, recording evidence, identifying the highest-impact gaps, and turning results into a 30/60/90 action plan. Designed to run as a focused 90-minute workshop with a small cross-functional team.

Workshop flow (90 minutes)

  1. Welcome & purpose (5 min)
  2. Individual quick scoring (10 min)
  3. Discuss and reach consensus on each capability score (25 min)
  4. Capture evidence and key gaps (20 min)
  5. Prioritize top 3 gaps and assign pilot owners (15 min)
  6. Agree quick wins and draft 30/60/90 plan (10 min)

How to use scores

Score each capability 0 to 4 where 0 = no capability / frequent failures, and 4 = robust, repeatable, measured, and improving. Focus discussion on evidence and recent examples. Use the combined picture and the Impact estimates to select the highest-impact, feasible pilots to run first.

Person running the workshop
Use YYYY-MM-DD or descriptive date
Default is 90
0=frequent failures / no systems, 1=basic controls, 2=consistent for parts of the operation, 3=measured and managed, 4=robust and improving
1.0 10.0
Score the overall quality capability including defect control and detection
1.0 10.0
On-time delivery, lead-time reliability and schedule adherence
1.0 10.0
Cost control, waste reduction and efficiency maturity
1.0 10.0
Equipment/process reliability, uptime and repeatability
1.0 10.0
Select all that apply
Describe the most persuasive evidence or recent examples that justify the scores
Describe the most important capability gap
Estimate the likely business impact if addressed
List one or more quick wins, owners and target completion dates
Use this draft to notify stakeholders. Example: 'We ran a short operational baseline assessment on [date]. Top priorities: [gap1], [gap2]. Pilot owners: [names]. We will deliver quick wins within 30 days and a 30/60/90 plan by [date].'
Use this field to capture immediate (30d), near-term (60d) and foundational (90d) actions and owners
Any constraints, required approvals or dependencies to note
You can explore this tool now. Sign in or create an account to save your responses and return to them later.
Make this tool part of your work

Save a personal copy, bring it to your team, or tailor the questions and workflow to fit what you are hungry to improve.

Member customization and team collaboration are coming soon.

Discussion

Comments and conversation will live here.