Prioritization & System Impact Worksheet

Use this worksheet to convert audit findings into a short, prioritized action list. Score each candidate action on Impact, Systemic Reach, and Effort, then calculate a priority score.

How to score

  • Impact (1–5): How much will this reduce safety risk, defects, delays, cost, or downtime? (5 = very high)
  • Systemic Reach (1–5): Does the fix change a local practice (1) or the system (5) — e.g., process design, supply rules, or standard work?
  • Effort (1–5): Estimated effort and time to deliver (1 = high effort, long time; 5 = low effort, quick win). Note: Effort is scored inversely to keep the math simple.

Priority score

Priority = Impact × Systemic Reach × Effort (higher is better). Focus on items with the highest scores and that include a named owner and verification step.

Worksheet table (copy into your spreadsheet)

Finding / Opportunity Impact (1–5) Systemic Reach (1–5) Effort (1–5) Priority Score Owner Target Date Verification (metric/check)
Example: Inconsistent gasket inspection 4 4 5 80 Maintenance lead 2 weeks Defect rate for gasket-related leaks < 1%

Next steps

  1. Choose top 3 actions from the worksheet.
  2. Confirm owners, short verification steps, and a check-in date (one sprint or 30 days).
  3. Track progress in your next operational huddle and update the worksheet after verification.

Discussion

Comments and conversation will live here.